Paper title | Grade | Expectations | Check all boxes that apply | Too commercial | Too commercial | ||
---|---|---|---|---|---|---|---|
2. Integrity Management of Difficult to “Smart-Pig” Pipelines Using Minimally Intrusive Sensors | Grade: entries: | 2. Integrity Management of Difficult to “Smart-Pig” Pipelines Using Minimally Intrusive Sensors: 0 | 0 | ||||
3. Reconfirming MAOP Using an ECA in Covered Segments | Grade: entries: | 3. Reconfirming MAOP Using an ECA in Covered Segments: 0 |
| 0 | |||
34. An Investigation of Relationship between IMU Bending Strain Measurements and Landslide-Related Pipeline Features in Appalachian Region, USA | Grade: entries: | 34. An Investigation of Relationship between IMU Bending Strain Measurements and Landslide-Related Pipeline Features in Appalachian Region, USA: 0 | 0 | ||||
35. Don’t Be Strained: A Case Study and Lessons Learned on Comparing Multiple IMU Data | Grade: entries: | 35. Don’t Be Strained: A Case Study and Lessons Learned on Comparing Multiple IMU Data: 0 |
| 0 | |||
44. The Role of Full-Scale Testing in Managing Pipeline Integrity | Grade: entries: | 44. The Role of Full-Scale Testing in Managing Pipeline Integrity: 0 |
| Too commercial | 0 | ||
18. Transmission Regulator Station MAOP Reconfirmation and Material Validation (192.624/192.607) | Grade: entries: | 18. Transmission Regulator Station MAOP Reconfirmation and Material Validation (192.624/192.607): 0 | 0 | ||||
Paper title | Grade | Expectations | Check all boxes that apply | Too commercial | Too commercial | ||
0.00 | 0.00 |