The challenge in many erosion remediation projects for pipeline water crossings lies in achieving a delicate balance: providing robust, protective coverage for the pipeline while minimizing impacts on aquatic life and the natural progression of the waterbody. Often, these projects resort to pipe lowering, a costly and environmentally disruptive measure that can interrupt pipeline operations, leading to service disruptions and financial losses. Although such projects ultimately yield a pipeline with reduced integrity risk alongside a naturally developing water body, the high costs involved often divert funds away from addressing other integrity issues. This can lead to further degradation of low cover and exposed sites awaiting funding.
The Enbridge L41 pipeline at the South Fork Nemaha crossing, which suffered from low cover due to both downward and lateral scour, serves as a case study. This study will detail five methodologies implemented to ensure adequate pipeline protection while facilitating the passage of aquatic life under typical low-flow river conditions. Initially, the project team pinpointed two upstream structures that altered historical flow patterns as the primary causes of increased scour, addressing these root causes as feasibly as possible. Secondly, a concrete mat system was deployed over the pipeline to provide cover without significantly elevating the riverbed. Thirdly, the bank, previously near-vertical and prone to scour and slough, was regraded to a more stable 2:1 slope to mitigate flooding during heavy rain. Fourth, traditional riprap was used to armor the bank’s toe up to the ordinary high-water mark, safeguarding against typical annual high flow events. Lastly, the area above the high-water mark was revegetated using willow species indigenous to the region, known for their rapid propagation and strong rooting on riverbanks, offering natural erosion protection during extreme flooding.
Available after the event