Carbon Capture and Storage (CCS) involves the conveyance of carbon dioxide (CO2) through pipelines from the capture facility to a storage field. While CO2 can be transported in a gaseous state, the dense or supercritical state is preferred due to efficiency and project economics, particularly for storage applications. This paper will review the integrity threats faced by purpose built and repurposed CO2 pipelines and the role of in-line inspections (ILI) in detecting and sizing critical defects while overcoming the mechanical and operational challenges of this medium.

The management of time-dependent threats in CO2 pipelines must overcome unique challenges in these high-pressure dense phase operations, which can be compounded with the presence of impurities originating from various industrial processes and applications. This paper reviews, in line with current industry understanding, the time-dependent threats which could arise in pure (naturally occurring) CO2 and anthropogenic (man-made) CO2 pipelines depending on operational scenarios. Key gaps and challenges are highlighted.

The requirements of in-line inspection programs in CO2 pipelines, aligned with the integrity threat review, are discussed, including specific considerations for pipeline change of product (repurposing). Considering historical pipeline design and practices (e.g. diameter, thickness, toughness), high operational stresses and specific offshore axial load considerations for offshore applications, the paper reviews critical flaw dimensions e.g. volumetric, crack-like, that may be applicable and reviews the capability of ILI under these circumstances. 

The paper then reviews the key design, mechanical and operational considerations and challenges associated with CO2 pipelines, considering fluid-specific properties, in successfully ‘designing’ and deploying in-line inspection programs in dense CO2. For example, the operational parameters and pipeline construction have key roles in defining the most adequate combination of in-line technologies and also the actual configuration of each cleaning pig and inspection tool. The current industry ILI limitations of diameter and pipeline wall thickness are also highlighted; this is of particular importance considering a trend of CO2 pipeline designs asking for higher wall thicknesses to address fracture propagation and accelerated corrosion issues, to the detriment of inspection capabilities (and thus safe integrity management) .

Exposure testing of tool components, customization of tool configurations, and proving robustness both mechanically and in terms of technology repeatability through a track record all contribute to in-line inspection run success in this increasingly important medium. 

KEYWORDS: CO2, CCUS, ILI, pipeline integrity, repurposing, testing