178

Recent updates to 49 CFR Parts 192 & 195 call for pipeline operators in the USA to comply with new regulations covering the construction and operation of their pipelines. These codes require that when a new line is constructed or when an existing pipeline is modified, it must be designed and built to accommodate the passage of ILI tools.

Besides the typical challenges of designing a new pipeline or modifying an existing one to ensure it meets the code requirements for ILI tool passage, some unexpected issues can occur when operators attempt to construct new lines or modify them to be piggable.  In particular, selection of small-diameter piping  (14" and below) and fittings can meet design standards, but still be completely unpiggable resulting in new pipeline construction that is less or not piggable at all. Several real-world situations are discussed where good intentions to increase piggability have backfired, including pipelines that are designed with restricted bores, pipelines that are constructed of materials that due to the manufacturing process have unexpected bore restrictions, and pipelines that have bore restrictions due to the construction process.

Read/Download PaperGradeAvailable after the event