56 Risk Based Prioritization of Hard Spot Mitigation

Abstract

Hard spots are a pipeline defect created during original manufacturing. These are typically considered stable unless acted upon by coincident environmental factors including coating degradation, atomic hydrogen, and stress. As a result of industry lessons learned and recent hard spot related failures on its system, Williams is executing a hard spot mitigation program that encompasses improvements to our risk assessment model to account for hard spot defects. In this presentation, we will share how we are incorporating this risk into our modeling approach and how those results influence the mitigation effort. Additionally, this presentation will discuss the benefits that can be realized through broader industry collaboration, current collaborative studies underway, and key metrics to advance industry understanding of the hard spot risk that ultimately will improve overall pipeline safety.

Topics of Discussion

  • Correlation to PDCA
  • Regulatory compliance with both CAD and US Regulations
  • Flowchart/cheat sheet for US/CAD ECA vs. EA comparison chart
    • ECA can be used for MAOP validation
    • EA used primarily as “get out of jail free” card.
    • FFS/RTS Eas cover all applicable threats. But EAs in general can be only about one threat or multiple.
  • Case study for sample EA (anonymized)
  • Theme: identify strengths in both EA and ECA methodologies and present an approach where their combined strengths are used to assess integrity of a pipeline asset.

Abstract: Pipeline Risk Forum

Read/Download PaperGradeAvailable after the event