187

Pipeline operators face several challenges during the implementation of a seam cracking integrity management program (IMP). Some of these challenges are related to improving the confidence on NDE dig data, ILI tool data analysis and crack sizing, and implementing crack assessment methodologies under a risk-based assessment framework. Overcoming those challenges is key for the development of an effective and efficient dig program and long-term asset management strategy.

As part of the seam cracking IMP enhancements, Imperial Oil Ltd used a new and innovative crack detection tool that was developed and recently presented by ExxonMobil at the 2024 European Pipeline Technology Conference. Although the new ILI tool has shown to be highly accurate, the success of the enhanced seam cracking IMP was the result of the implementation of supporting integrity programs to ensure the right information and assessments were being used.  

This paper and presentation will discuss the steps that were followed for the implementation of a successful ERW seam cracking IMP. Details about the new ultrasonic ILI technology with consistent and reliable tip diffraction sizing capability, the implementation of a structured NDE and validation program, the deterministic and probabilistic evaluation of reported seam weld anomalies using the PRCI MAT-8 methodology, and the implementation of a risk-based approach for dig selection and definition of a long-term seam cracking management plan, will be included in this document.

Read/Download PaperGradeAvailable after the event