1Expro, Houston, USA, 2Phillips 66, Houston, USA
Inline inspection (ILI) tool performance is highly dependent on maintaining tool velocity within a defined operating window. However, many pipeline systems lack the control resolution required to consistently meet these constraints under live operating conditions. This limitation is particularly pronounced in high-flow transmission pipelines, where nominal conditions may exceed ILI velocity limits as well as gas gathering lines that have multiple intakes and outlets resulting in multiple flow regimes along the length of the line. In both cases conventional control methods are unable to achieve or maintain the required reductions in velocity in a consistent manner. A field application was executed by Expro in collaboration with Phillips 66 on a 12-inch natural gas gathering pipeline to evaluate a new closed-loop velocity management system, Velonix™, which is designed to regulate pipeline flow velocity in real time. Under nominal operating conditions, the pipeline flowed at approximately 499 psig and 37 MMSCFD, resulting in a measured velocity of 11.1 mph, exceeding the ILI tool's maximum allowable velocity of 9 mph. The applied system utilized a non-intrusive velocity meter and a digitally actuated control valve to increase nominal pipeline pressure, thereby increasing fluid density and reducing velocity to within the required operating range without affecting the mass or volumetric flowrate of the pipeline system. This approach prevented the pipeline operator from having to make any flow changes to their system during pigging operations. The system was deployed during both cleaning pig and ILI tool runs, with velocity setpoints established and adjusted in coordination with the operator during execution. Controlled operation resulted in an average pipeline velocity of 5.7 mph, consistent with third-party pig tracking measurements of 5.6 mph and onboard ILI tool measurements of 5.0 mph, 51.4% less than the nominal flow velocity resulting in velocity conditions suitable for ILI integrity data acquisition. During active closed-loop control, the standard deviation of recorded velocity was calculated at 1.9%, demonstrating stable velocity regulation within ILI requirements. Real-time system response enabled setpoint changes during the run, with measured velocity setpoint adjustments occurring within approximately three minutes across a 9.4-mile segment. In addition to velocity control performance, it was observed that during active manipulation of pipeline operating conditions, the system operated within a transient state that resulted in lower peak pressures than those predicted under steady-state assumptions. This behavior enabled successful completion of the pig run without exceeding anticipated pressure constraints and informed subsequent methods for pre-calculating transient pressure response during operations. The results demonstrate that closed-loop control of pipeline velocity can reliably maintain ILI tool speeds within specified limits under live operating conditions, improving inspection data quality and operational predictability. The integration of real-time measurement with automated control provides a repeatable method for managing velocity in systems where traditional approaches are either insufficient or inconvenient, with demonstrated benefits in both high-flow and dynamically varying pipeline environments. Keywords: pipeline pig velocity speed control inline inspection ili unpiggable difficult to inspect meter pigging optimization automation flow assurance performance integrity
Available after the event



