F. HYDROSTATIC TESTING OF PIPELINES


COURSE SCHEDULE (both days)
7.30: Registration, breakfast, coffee
8.00 – 5.00: Course
It will be necessary to bring a laptop to this course.

This course is designed for pipeline personnel in engineering, integrity management, operations, and regulatory compliance roles. This course will cover a wide range of topics related to hydrostatic testing of pipelines for gas and hazardous liquid service for both in-service and new construction according to CFR 49 Parts 192 and 195.

COURSE OBJECTIVES

To provide attendees with necessary information for planning and conducting a successful hydrostatic test, whether it’s for initial service or retesting existing lines. Planning will cover review of integrity prior to testing through evaluation of test results. The course will focus on testing with water but testing with other medium will be discussed.

CONTINUING EDUCATION UNITS

On completion of the course, participants will be awarded 1.4 CEUs.

WHO SHOULD ATTEND

The course is intended to cover the technical aspects of planning and conducting a hydrotest. It is designed for engineers, project managers, integrity management, and operation personnel to prepare for testing. The following topics will be covered:

  • Pipeline integrity review
  • Water source identification, disposal, and permitting
  • Leak detection
  • Risk assessment and contingency planning
  • Calculations for test pressures according to 49 CFR 195
  • Assessment of test results, including methods of analyzing pressure discrepancies
  • Test scheduling
  • Documentation for regulatory review

INSTRUCTOR

Hollis Gibbs, PE, PMP, is Chief Operating Officer and Vice President of Projects at ABADIE LLC, where he provides project management, engineering, and technical support for pipeline and midstream projects. Previously, he served as ExxonMobil Pipeline Company’s Hydrotest Execution Engineer, leading the planning and field execution of more than 600 miles of mainline hydrotests on in-service crude oil, refined products, HVL, and gas pipelines across the United States. He authored EMPCo’s Hydrotesting Manual and has experience with test planning, water management, pipeline isolation, product displacement, failure response, pressure-volume analysis, commissioning, and integrity assessment. His broader experience includes pipeline and station design and construction, ILI and repair programs, commissioning, and operational support.

SYLLABUS

1. Establishing Test Requirements

  • Purpose of the test
    • Evaluate integrity of the pipeline
    • Confirm integrity program
  • Establishing pressure requirements
    • Federal regulatory requirements
      • Liquid – 49 CFR 195
      • Gas – 49 – CFR 192
    • Pressure parameters based upon MOP/MAOP requirements
    • Strength Test
    • Leak Test
    • Spike Test
  • Segment Isolation
    • Headers & End Caps
    • Valves
      • Gel Isolation

2. Conducting a Safe Test

  • Risks of potential energy
    • Compressed gas
    • Compressed liquid
  • Protecting the public
  • Managing test safety
    • Immediate area
    • Equipment
  • Communication prior to and during a test

3. Preliminary planning

  • Pipeline evaluation
    • Historical records evaluation
      • Repairs
      • Previous test records
      • Integrity records
  • Equipment pressure ratings
  • Elevation profile
  • Water sources
  • Water crossings
  • Exposed pipe

4. Test Schedule

  • Preliminary Scheduling
    • Water source & landing
    • Outage
    • Permitting
    • Pipeline rehabilitation
    • Notifications
  • Test Setup
    • Site preparation
    • Line Isolation
    • Line fill
  • Test Sequence
    • Stabilization
    • Pressurization
    • Test time
    • Depressurization
  • Water movement & discharge
  • Restoring a line to service

5. Water as a test medium

  • Source
    • Permits
    • Volumes
    • setup
  • Discharge
    • Permits
    • Treatment
  • Volume requirements and calculations

6. Other test medium

  • Liquid hydrocarbon
  • Natural gas
  • Nitrogen
  • Air
  • Applications
    • Requirements
    • Changes in test planning
    • Instrumentation

7. Leak Detection

  • Dye
  • Gas
  • Acoustic pressure
  • Section isolation
    • Valves
    • Freeze plugs
    • Test headers/caps

8. Test Documentation

  • Graphs
  • Calibration certificates
  • Drawings
  • Elevation profile
  • Test procedure
  • Summary of results
  • Explanation/calculations of pressure changes
    • Test pressure interpretation
    • Temperature effects on pressure
    • Air entrapment
    • Examples of test results and interpretation
  • Pressure Volume (PV) Plot
    • Creation of a PV Plot
    • Offset Line
    • Interpretation of a PV Plot
  • Test log
  • OQ documentation
    • Historical records evaluation
      • Repairs
      • Previous test records

9. Managing water movement

  • Fill rate
  • Purging prior to line fill
  • Dewatering
    • Product
    • Air
  • Drying
    • Explanation of terminology
      • Penetration depth
      • Dew point and temperature
  • Air lock
  • Contamination
  • Contingency
    • Drain up calculations
    • Refill/Retest planning
  • Discharge
    • Rates
    • Discharge structure
    • Treatment of contaminated product
  • Pigging
    • Types
    • Multiple pigs in the line
    • Launching receiving
    • Bypassing a station
    • Tracking

10. Instrumentation

  • Types – Pressure & Temperature
    • Bourdon Tube (Pressure & Temperature)
    • Bi-metallic (Temperature)
    • Resistance Temperature Detector (RTD)
    • Quartz electronic
  • Accuracy vs. Repeatability
  • Calibration
  • Pressure measurement
    • Deadweight – Mechanical/Electronic
    • Gauges
    • Recorders
  • Temperature
    • Thermometer
    • Recorders
      • Quantity
      • Placement
      • Type
  • Volume measurement
    • Stroke counter
    • Flow meter

11. Data Interpretation & calculations

  • Pipeline evaluation
    • Historical records evaluation
      • Repairs
      • Previous test records

12. Test Failure

  • Rupture
  • Leak
  • Pressure reversal
  • Equipment failure
  • Location of failure
  • Repairs
  • Retesting

13. Contingency Planning

  • Repair materials
    • Sleeves
    • Replacement Pipe
    • Stopples
  • Emergency Response
    • Public relations
    • Notifications
    • Cleanup and remediation
  • Retesting
    • Venting & refill