Abstract
Gas storage is a critical infrastructure that provides the ability to balance natural gas transmission systems to meet short- and long-term user demands. Natural gas can be stored in above ground facilities, and below ground in caverns and rock formations. There are over 400 active gas storage facilities throughout the North America that provide over 20% of the natural gas required to meet the seasonal winter month demand. These storage facilities are part of the gas transmission network and are directly tied to the system to be accessed as needed. Given the criticality of the natural gas storage infrastructure, like all pipeline infrastructure, it must be inspected. In many cases the pipelines from the natural gas storage wells to the main measurement regulating facilities do not have provisions to inspect the lines efficiently while under pressure or via inline with the media due to flow conditions, pipe fittings and lack of launch and receive facilities. Furthermore, given the criticality of the storage infrastructure, there are very tight outage windows to complete the pipeline inspections. Due to the inspection challenges, these systems are usually completed via a robotic crawler. This paper reviews the recent inline inspection campaign of a network system feeding a natural gas storage infrastructure, through detailed planning and pre job testing, the ability to efficiently and effectively utilize MFL combination tether technology to inspect the network in unprecedented time. Using tether technology, the 13-pipeline segment system, was inspected in under one week, which included multiple pipeline diameters, vertical launches, and short radius bends.
ILI Applications, “Unpiggable” inspections and technologies
Available after the event



