29 Beyond Standard ILI Analysis

Abstract

Within the framework of the requirements defined by API 1163, close cooperation between the operator and ILI service provider is required to manage pipeline integrity. Nevertheless, many factors could contribute towards the lack of cooperation – discussion of requirements and challenges, lessons learnt, and sharing of NDE results. There is growing evidence of a willingness to share NDE results; however, this paradigm shift is not just because operators understand that the vendor always has full visibility of ILI data to support performance validation. Rather, there is also the realization that improvement processes can be stimulated in general. Furthermore, through meaningful interaction, a holistic inspection project can be achieved on a pipeline-specific basis. A case study will show how a specific pipeline threat was addressed by considering historical records beyond the standard analysis of an inspection project by utilizing additional ILI data sets (integrated analysis). This would not have been possible without close cooperation from the start of the inspection project.

Read/Download PaperGradeAvailable after the event