229

TC Energy operates a 430 km (267 mile) NPS 24 pipeline through the Sinaloa state of Mexico, supplying natural gas to a main client power plant near Mazatlán.  The system is configured with a compressor station 500 km (310 miles) upstream of the NPS 24 pipeline, and the final compressor station is located at the end of the pipeline near the power plant.  This compressor configuration results in the system operating with low differential pressure along the line and flows that are dependent on the client’s demand.

Due to the unique operating conditions, inline inspection (ILI) of the system can be unpredictable and challenging, requiring an engineered approach since standard ILI methods may not be sufficient. This paper describes the collaboration between the operator and ILI vendor, and the ILI vendors approach to successfully inspect the line. An optimized ILI Magnetic Flux Leakage (MFL) TriStream combo tool was utilized, reducing the tool differential pressure requirements by more than 66% and allowing navigation of the pipeline at low differential pressures, while still providing validated Ultra-High resolution Triaxial sizing specification.

Read/Download PaperGradeAvailable after the event