1ROSEN Group, Houston, USA, 2ROSEN Group, Newcastle upon Tyne, UK, 3Enbridge Gas, Toronto, Canada
At the 2025 Pipeline Pigging and Integrity Management (PPIM) Conference, a paper was presented describing a Non-Intrusive Pipeline Assessment (NIPA) approach for the integrity assessment of conventionally unpiggable and operationally constrained pipelines, integrating Large Standoff Magnetometry (LSM) into the External Corrosion Direct Assessment (ECDA) process. This paper presents the review and lessons learned from the first year of North American NIPA deployments. NIPA combines Close Interval Survey (CIS), Direct Current Voltage Gradient (DCVG), and LSM with AI-driven predictive analytics derived from a global integrity data warehouse comprising tens of thousands of ROSEN In-line Inspection (ILI) datasets, enriched with pipeline and environmental data. The approach enhances ECDA by improving pre-assessment, indirect inspection, and data integration. Outputs are expressed probabilistically as likelihoods of corrosion exceeding defined wall-thickness thresholds, enabling risk-informed prioritization across large asset bases, supported by ILI data. Field applications from multiple North American systems across unpiggable and piggable pipelines are presented. Integrated analysis of CIS-derived under-/over-protection, DCVG coating defects, LSM stress concentration zones, and AI corrosion predictions were used to rank and prioritize anomalies for excavation. Where available, results were compared against ILI data to assess spatial alignment and severity trends. Results show individual methods often provide incomplete indications, while integrated analysis improves anomaly discrimination and excavation targeting. Limitations include interpretation of stress response relative to metal loss, data alignment sensitivity, and reliance on validation through excavation or ILI. Key learnings indicate that combining AI analytics, physics-based inspection, and operator validation provides a robust quantitative framework, improving excavation efficiency and reducing non-productive digs. This would also improve pipeline condition and risk assessments especially where only above-ground survey is feasible.
Available after the event



