Unpiggable No More: Successful Inline Inspection in Challenging Gas Gathering Systems

Thursday - January 28 | 14:40 · 5.3 Unpiggable or Difficult-to-Inspect 1

Mukund Belavadi1, Adam Pipe1, Boyd Abshire1

1Phillips 66, Houston, USA

Mukund Belavadi, Adam Pipe, Boyd Abshire
Phillips 66, Houston, USA

Inline inspection (ILI) is not mandated by US and many federal regulations for gas gathering systems; however, many operators and producers deploy ILI on selected critical gathering lines to support integrity management programs, improve system reliability, and enable proactive maintenance. Successful ILI execution requires specific operating conditions, including controllable flow rates, appropriate pressures, adequate line cleanliness, and passable pipeline geometry. Achieving these conditions in gas gathering systems is often difficult due to non-standard designs and normal operating constraints. Both operational and commercial challenges can prevent typical operating conditions from meeting ILI requirements. Operational challenges include excessive or insufficient flow rates, multiple inlets and outlets that create complex and fluctuating flow regimes, extreme operating pressures, and difficulties associated with pre-inspection line cleaning. Commercial challenges include contractual commitments and producer reluctance to curtail production, reroute gas volumes, or remove lines from service to support ILI operations, whether conducted with natural gas or offline media such as water or nitrogen. Accordingly, successful ILI deployment in gas gathering lines-particularly for first-time inspections-requires treating each line as a standalone project. Customized planning, preparation, and execution tailored to the specific operating characteristics of the line are essential. Early stakeholder engagement, coordination among operator's teams, support and inspection vendors, a "thinking outside of the box" approach to solutions and flexibility during execution are critical elements in overcoming both operational and commercial constraints. This paper presents two case studies in which customized planning and coordinated execution enabled successful ILI runs in gas gathering lines that were previously deemed almost unpiggable. The first case study involves an ILI run in a system with multiple inlets and outlets that produced varying flow regimes along the pipeline. The second case study addresses a more challenging scenario involving multiple inlets and outlets combined with flow rates and pressures that exceeded conventional limits for controllable ILI tool speeds. Together, these case studies demonstrate practical approaches, lessons learned, and operational strategies applicable to integrity management of gas gathering systems.

Read/Download PaperGradeAvailable after the event