Misaligned by Design? A Data-Driven Look at Pipeline Weld Misalignment

Thursday - January 28 | 11:00 · 7.2 ILI Analysis 2

Rhett Dotson1, Kyle Platt2, Grant Myers2, Cassie Ruminski3, Justin Healy3

1D2 Integrity, Houston, USA, 2Marathon, Cannonsburg, USA, 3D2 Integrity, Boise, USA

This publication presents a case study on using inertial measurement unit (IMU) data to identify and characterize weld misalignment in pipelines. The investigation was initiated after a weld failure occurred in a 20-inch gas gathering line constructed in 2013. Metallurgical analysis of the failed girth weld found no evidence that weld quality or manufacturing practices caused the failure; instead, field data suggested that the rupture resulted from a combination of weld misalignment and external loads. To evaluate whether IMU data could identify and size weld misalignments, a candidate line from the same construction period was selected for analysis. This paper describes the IMU-based approach, reports the observed weld misalignment distributions from the candidate line, compares those distributions with pipeline construction requirements and ASME B31.8 alignment limits, and presents a field validation of one reported angular misalignment. The results provide a first-of-its-kind view of weld misalignment distributions derived from IMU data and offer operators practical context for interpreting weld misalignment in bending strain analyses, planning validation work, and understanding expected measurement accuracy.

Read/Download PaperGradeAvailable after the event