243

Gary Senior1, Jane Haswell1, Nancy Thomson2, Gemma Simpson2, Max Koronka2, Andrew Cosham3, UK.2, UK.3

1Pipeline Integrity Engineers, Newcastle upon Tyne, UK. 2SGN, Edinburgh, UK. 3Ninth Planet Engineering, Newcastle upon Tyne, UK

The Local Transmission System (LTS) is the backbone of the United Kingdom (UK) energy network, delivering natural gas from the National Transmission System (NTS) to towns and cities across the country.

 The four Gas Distribution Networks (GDNs) operate approximately 11,000 km of high-pressure pipelines, operating at pressures above 7barg. The pipelines were originally designed to transport and store natural gas. 

 The UK Hydrogen Strategy states that: “Low carbon hydrogen will be critical for meeting the UK’s legally binding commitment to achieve net zero by 2050”. Hydrogen behaves differently to natural gas, therefore it is necessary to assess how it affects the existing LTS infrastructure.

 The LTS Futures Project is a first of a kind, £30 million, joint funded project between SGN, the UK energy market regulator OFGEM, and the other UK GDNs. The project is led by SGN and has repurposed a 30 km natural gas transmission pipeline to hydrogen for a live demonstration trial, which will inform the development of a Blueprint methodology for repurposing the LTS. The LTS Futures Project is researching, testing and collating evidence to understand the compatibility of LTS assets, pipelines, associated plant and ancillary fittings in hydrogen which will be captured in the Blueprint.

 This paper provides details on the technical approach adopted by the project, the progress to date and the plan going forward. 

Read/Download PaperGradeAvailable after the event