231

Pipeline dents — caused by external forces impacting the pipeline surface — pose significant integrity risks due to their potential to trigger immediate or delayed failures. While In-Line Inspection (ILI) tools are commonly used to detect and manage dents, accurately evaluating and prioritizing critical injury dents that require immediate action remains a complex challenge.

This paper introduces a practical, combined assessment methodology for pipeline operators. It integrates dent strain damage criterion with ILI signal characteristics to effectively identify dents associated with corrosion, gouging, or cracking. Furthermore, an enhanced technique is presented to distinguish between plain dents and mechanical damage, particularly for topside dents. Case studies are included to illustrate the effectiveness of this integrated approach in identifying high-risk dents that require immediate attention, as well as the enhanced method for identifying mechanical damage.


Read/Download PaperGradeAvailable after the event