2024 – 21

Frank Micheli1, Ken Maxfield2, Phil Tisovec2

1Bridger Pipeline, Casper, USA., 2KMAX Inspection, Millcreek, USA

Abstract

Bridger Pipeline operates a crude oil gathering system, of approximately 3500 miles, in the Williston Basin of western North Dakota, eastern Montana and the Powder River Basin of Wyoming in the USA.   The Bridger system contains many small diameter (3” to 6”) gathering lines that are a challenge to inspect with ILI tools.  These challenges include low flow conditions, line cleanliness and paraffin build up.  Many are first time inspections of pipelines with limited or unknown records, trap configurations, and fittings such as heavy wall tees and elbows. Also of concern are weather constraints with the seasonality of ILI inspection projects for pipeline repair and access.  This paper presents how these challenges are addressed to successfully run ILI to comply with Bridger’s integrity management program.

Read/Download PaperGrade