2024 – 03

Zain Al-Hassani1, Simon Slater2, Chris Davies3

1TC Energy, Houston, USA., 2ROSEN, Columbus, USA., 3ROSEN, Houston, USA

Abstract

Gas transmission operators are now required by regulation to reconfirm the MAOP of pipelines lacking traceable, verifiable, and complete (TVC) pressure test records. TC Energy operates a 20” natural gas transmission pipeline in Northern Ohio, which has 54 individual segments that meet the requirements of a covered segment as per §192.624 (a)(1). TC Energy performed an Engineering Critical Assessment (ECA) of the pipeline to reconfirm the MAOP. The foundation of the ECA was a full suite of in-line inspection (ILI) technologies to detect, identify and size the anomalies that remain in the covered segments. This included ILI technologies capable of detecting crack-like anomalies, selective seam weld corrosion, and hard spots. ILI was also used to measure material properties and attributes when these were not known. Using the material data together with other data sets, the different populations of pipes within the covered segments were identified. TC Energy used this full suite ILI approach for ECA as pilot project. As such, a pressure test was also performed to confirm the applicability of the ECA approach.  The ultimate aim of the exercise was to compare the two methods holistically across one example line to help develop a better understanding of which method should be used and when. This paper provides a walk-through of the ECA process performed by TC Energy and ROSEN. It provides a description of the documentation and specific content required by §192.632. It is intended to provide operators with an example of how an ECA is performed and highlight some of the critical aspects that have to be considered.

Read/Download PaperGrade