32 Survey of Impact: RIN-2 Final Rule

Abstract

New federal regulations contained in RIN 2137–AF39 titled “Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments” impose new requirements on natural gas transmission pipeline operators. This presentation will provide an initial survey of impact of the Final Rule on operators affected by the final piece of a decade-long effort by PHMSA to amend its regulations of onshore gas pipelines, known as the “Gas Mega-Rule”.

This new rulemaking considers lessons learned from recent onshore gas transmission pipeline incidents and codifies a management of change process. The rulemaking also clarifies certain integrity management, assessment, corrosion control, repair, high consequence area (HCA), and extreme weather event requirements, as well as revises or creates new definitions related to the above amendments.

Compliance requirements, key dates, and a sample case study on the ramifications to corrosion control and integrity management repair criteria will be provided. Integrity Solutions® Ltd will not be producing a white paper to support the presentation, however, an advanced preview of the presentation can be provided.

Read/Download PaperGradeAvailable after the event