Abstract
Pipeline failures in today’s social, environmental, political, and global sustainability climate have a consequential impact on pipeline operators and owners. These consequences are exponentially higher when the hydrocarbon release takes place near, over or into coastal waterways, ship channels and oceans. Even so, regulatory pressure and compliant stewardship lags the onshore transmission pipeline industry and related Integrity Management Programs (IMP’s). The financial impact and ramifications to shareholder value for spills over the past couple of decades have impacted the safety and health of neighboring communities and wildlife and ultimately cost operators billions in fines, legal costs, and the negative impacts to brand equity and sustainability goals. High consequence assets require direct measurements that cover the entire pipe surfaces to help ensure the fitness for service and flow assurance necessary to support their critical yet intermittent operation.
This presentation will highlight how a Northeastern Pipeline Company with wharf line operations is taking this threat seriously by using built-for-purpose ultrasonic inline inspection technology, seldom needing line modifications, to assess the integrity and fitness for service of their wharf line piping network. This approach enabled the company to optimize capacity by safely maximizing throughput while also minimizing risk to environment and business continuity.
The Operator had multiple pipelines spanning several diameters servicing a wharf used to transfer fuel from the dock to the tank farm. The goal for this project was to gain confidence in the continued safe and reliable operation of these pipelines by having 100% of the piping inspected to ensure all potential integrity threats were known, and if needed, appropriate action could be taken to mitigate any significant risks identified in the assessment. To accomplish this, the Operator utilized ultrasonic inline inspection technology to inspect the lines for both wall loss and deformation in a single pass.
Additional reasons to those above for selecting this technology included the need for a bi-directional tool capable of negotiating tight bends that posed the least risk for getting lodged during operations, while collecting direct, accurate measurements of anomalies across the entire pipeline. The end result was a successful execution on the first mobilization, preliminary and final reporting were delivered in an expeditious manner to help ensure safe continued operations.
By nature, inspection of dock side pipelines requires different planning and support than onshore pipelines. This paper will elaborate on such a process and how the efficiency and ease of a well-planned project can impact future operations by reducing risk, ensuring the safe and reliable service of critical energy infrastructure.