Abstract
Three in-line inspection (ILI) runs were done on a 10-inch Grade X52 sour gas pipeline which was constructed in 2009. There was suspected oxygen ingress early in the operating life of the pipeline and uninhibited methanol was regularly used in the pipeline. The ILIs were completed in 2010, 2015, and 2020. The first run identified 789 internal metal loss features with the deepest feature being 41% of wall thickness deep. The second run identified 1917 internal metal loss features with the deepest feature being 55% of wall thickness deep. The third run identified 3812 internal metal loss features and 494 cluster anomalies and reported the deepest metal loss feature to be 80% of wall thickness deep.
Probability of Exceedance (POE) analysis was utilized to assess the 2020 ILI data due to the significant degradation being found in the pipeline. The work presented in this paper utilized the ILI and subsequent integrity dig data to further support the POE analysis. Upon receipt of 2020 ILI data, the internal corrosion features were characterized, first, and the burst pressure for each feature was calculated. Based on the calculated burst pressure, it was recommended that the pipeline maximum operating pressure (MOP) be lowered from the original 9,930 kPa to 5,500 kPa to reduce the number of required immediate repairs. Next, a POE analysis was conducted using the calculated unmitigated corrosion rate and the recommended reduced MOP. Features which exceeded the specified POE threshold from Year 0 to Year 5 were identified and integrity digs for the identified joints were prioritized and recommended to the pipeline operator.
After completion of the integrity digs and direct inspection of the pipe, the 2020 ILI run was regraded, and the POE analysis was updated. Additional findings from the inspection associated with blisters and cracking were addressed and added into the integrity program along with the POE assessment.
This paper provides details of the ILI data analysis, corrosion rate calculation, and the methodology used to prioritize the integrity digs. In addition, the incorporation of integrity dig data into refining the future integrity program and updating the POE assessment is discussed.
Available after the event