2024 – 33

Joel Van Hove1, Casey Dowling2, Pete Barlow3

1BGC Engineering Inc., Vancouver, Canada., 2BGC Engineering Inc., Golden, USA., 3BGC Engineering Inc., Edmonton, Canada

1BGC Engineering Inc., Vancouver, Canada. 2BGC Engineering Inc., Golden, USA. 3BGC Engineering Inc., Edmonton, Canada

Abstract

Well-structured geohazard management programs (GMPs) for pipeline systems have become common over the last two decades in North America as pipeline companies have become more aware of the risks presented by natural hazards and the value in adopting proactive approaches to manage risk. The case study presented in this paper represents the GMPs of 30 major pipeline companies in North America comprising approximately 100,000 miles of operating and actively managed pipeline. The performance of these GMPs has been measured to reduce pipeline failure rates from geohazards 4 times. Over the past 10 years more than 95% of the observed geohazard pipeline failures have been from slow-moving landslides. The study scope includes approximately 10,000 landslide crossings. The annual probability of failure given pipeline impact from a slow-moving landslide has previously been estimated at 1 in 50, meaning any landslide which is actively moving and intersecting a pipeline presents a potentially serious integrity concern. The primary challenge with managing slow-moving landslide hazards is that determining landslide activity without instrumentation is often not possible, and installing conventional instrumentation such as slope inclinometers at such a large number of landslides is prohibitively expensive. Slow moving landslides also cannot reliably be visually identified as movement rates are often low enough that visible surface disruption is subtle or undetectable, but those same movement rates will be enough to cause pipeline failure over the life of the pipeline. To address this challenge many forms of low-cost instrumentation have been pursued to measure ground movement and/or pipeline impact including Interferometric Synthetic Aperture Radar (InSAR), lidar change detection, and in-line inspection tools such as axial strain and inertial measurement unit (IMU). Over the last 10 years IMU has become a critical and frequently utilized tool for assessing landslide activity and has been integrated into the geohazard management programs of all the operators in the study scope. In 2022 IMU was credited for identifying 53% of the active landslides where operators completed critical interventions to manage risk (e.g., pipeline shut in, stress relief mitigation). Key lessons and observations for successfully integrating IMU into GMPs are presented from a case study spanning 10 years and 100,000 miles of pipeline.

Read/Download PaperGrade