Abstract
Although a lost or stuck pig is rare, when it does occur, the costs can be extremely high, raising the location efforts to the highest priority.
A lost or stuck pig in a pipeline can have a serious impact on an operator’s ability to transport product. While uncommon these days, this does still occur, and when it does it can be detrimental to the safe and efficient operation of an Oil and Gas pipeline. Therefore, the ability to identify the location of the obstruction quickly is of utmost importance and can become a singular highest priority for the pipeline operator. Recent advancements in technology have facilitated such locating efforts, and saved operators time, expense and aggravation.
Oil and Gas pipelines are comprised of ferromagnetic materials, such as iron, nickel, steel and other materials. Large Standoff Magnetometry (LSM) technology is known to be used to identify and locate elevated levels of stress through the measurement of the magnetic field surrounding steel pipelines. LSM detects inverse magnetostriction (also known as the Villari effect) which is the change of the magnetic susceptibility of a material when subjected to mechanical stress. LSM technology has been used to detect defects as they appear as changes in the magnetic field around the pipeline which can indicate the presence of stress on the pipe. Thus, LSM can identify stress concentration caused by full pipeline blockages.
This paper will discuss how the XLI PWA technology works to locate lost or stuck pigs, and review 3 successful case studies.
Case Study 1 will discuss locating a lodged MFL tool in a 42” Gas pipeline. PureHM worked with TC Energy to locate an MFL tool that had become lodged in their line. TC Energy was ready to excavate and cut the tool out but required confirmation that they were in the right area before investing significant resources into the tool retrieval process, PureHM was able to mobilize and confirm tool location in a single day.
Case Study 2 will explore a project where a pig was lost and was fully obstructing the pipeline. Pembina provided several potential locations where the pig was thought to have stopped moving. Within 2 days PureHM was able to locate the stuck pig and the front of the blockage. Pembina was able to free up the stuck pig by Hot-Tapping.
Case Study 3 will present a more complex project where PureHM worked with Keyera to identify the location of multiple stuck pigs that were being obstructed by a wax slug in a 4-inch pipeline. PureHM worked over a period of 4 days to identify the location of the 2 stuck pigs. Keyera was then able to heat the pipeline at the location identified by the XLI PWA Technology and melt the wax obstruction to get the pipeline operational again.