2024 – 78

Bernardo Cuervo

EN Engineering, Houston, USA

Abstract

As in-line inspection (ILI) yields the highest-per-mile discovery of anomalies, running cleaning pigs and ILI tools are an important part of most integrity management programs. However, not without their risks. On June 28, 2021, a natural gas explosion occurred after workers inserted a gauge plate in a launcher trap as part of a routine pigging activity. The explosion went through the open launcher enclosure, ejecting the pig from the barrel, injuring two workers and killing two more. On November 15, 2021, PHMSA published the Final Rule: Safety of Gas Gathering Pipelines (86 FR 63266). With this rule, more than 400,000 additional miles of gas gathering pipelines are now covered by Federal reporting requirements. Proactive operators are beginning to ascertain the ILI feasibility of thousands of miles of gathering pipelines for future ILI. Many of these pipeline operators are beginning to audit and review their pigging procedures to prevent catastrophic incidents. This paper describes the entire process from the perspective of a pipeline operator; including the experiences of maintenance personnel, and the challenges faced by field operations during the implementation and use of a new methodology.

 

Read/Download PaperGrade