1National Gas Transmission, Warwick, UK., 2PIE, Newcastle, UK., 3DNV, Loughborough, UK., 4STATS, Aberdeen, UK
1National Gas Transmission, Warwick, UK. 2PIE, Newcastle, UK. 3DNV, Loughborough, UK. 4STATS, Aberdeen, UK
Abstract
National Gas Transmission own and operate the National Transmission System (NTS), the backbone of British Energy. The NTS feeds homes and businesses the essential gas required for life today in the UK. When operating above 70 bar, like most of the network does, the potential of failure or downtime of these pipelines has a critical impact on how interventions are carried out. However, changing how we do these interventions isn't as simple, but why can’t we just make it so?
In line isolation tools have never been used on downstream onshore pipelines in the UK before. Regardless of the experience of others, NGT must assure itself through a process of due diligence that the new technologies and techniques do not create an immediate threat, or future integrity threats to the remaining life of the pipeline. NGT has developed an approval process, and has been trialling and testing tools, to develop an unbiased viewpoint built on evidence on the operational acceptance and integrity implications for the pipeline.
NGT has conducted an Isolation Joint replacement using a Pipeline Isolation Tool, instead of traditional venting (emissions reduction) and the need for recompression operations or alternative more invasive options (stoppling and bypass). The technology provided a fail-safe, leak tight double block, and monitor isolation, keeping a 48” pipeline fully pressurized at 56bar for 56km to the nearest block valve upstream. This method can help to reduce NGT’s emissions and operators’ exposure to high hazard methods.