Inspection is used as part of a pipeline integrity management program, to control the risks associated with pipeline failure. Risk based inspection (RBI) methods are commonly used to schedule pipeline inspections. However, the RBI methodologies and approaches which are applied in the pipeline industry are many and varied.
This paper presents and discusses practical application of a pipelines RBI process which provides a direct link between the inspection interval and the risk associated with a loss of containment failure from a pipeline. The RBI methodology considered applies reliability engineering methods to account for the perceived increase in risk over time, due to both degradation-related time-dependent threats and randomly occurring event-driven threats. The presented approach is flexible, allowing detailed, quantified engineering relationships and historical incident rate data to be used where available, with more subjective input from subject matter experts and engineers when required. The uncertainty associated with the assessments is accounted for explicitly, allowing different levels of analysis complexity to be accommodated within the same overall pipeline system RBI study.
The RBI approach schedules inspections such that they are completed before risk reaches a tolerability limit. This ensures that inspections are targeted appropriately to control the risk of pipeline failure. The RBI process also identifies when additional risk mitigation is required to control risk, for example this may be the case if inspection would be required at an impractical frequency, or if no suitable inspection method is available. The assessment process can be further used to investigate the effect on the assessed risk level of changes in the inspection schedule.
This paper builds upon and updates a methodology and process first developed twenty years ago. The study presents an improved development of the methodology and discusses the authors’ experience of practical application and implementation of the RBI process, for large offshore pipeline systems. This practical experience includes elements such as dealing with requirements to combine inspections into optimised campaigns, as well as accounting for the time required to review, assess and act upon inspection findings. The review of experience also considers alignment of the RBI with corporate systems, procedures and risk matrix definitions. The paper concludes by identifying the key elements leading to successful development of an RBI schedule for offshore pipeline systems.
Available after the event