OQ Gas Networks (OQGN) is the exclusive operator of Oman’s natural gas transportation system comprising a network of around 4,500 Km of pipeline that supply gas as fuel and feedstock to many customers across Oman. One of OQGN pipelines, is a 10" pipeline that is crossing the capital city (Muscat) to one of the customers in high population area. The pipeline was commissioned in 2007, with a total length of 40 Km. Throughout the years, the pipeline has been suffering from external corrosion which resulted in a deration from 92.0 Barg original design to 66.0 Barg. All the locations affected by external corrosion are located at the field joint area due to Heat Shrink Sleeve failure.
Since construction in 2007, the first heat shrink sleeve failure was observed on 2014 ILI, that is after 7 years in operation only. The corrosion rate of those defects various from one location to another, however the maximum localized corrosion rate was calculated approximately 0.3 mm/y. As the pipeline has a low thickness of 4.6 mm, operating the pipeline with this corrosion rate make it critical in terms of inspection, integrity assurance and repair strategy.
Since 2014, a total number of 4 ILI runs were done. Analyzing defects growth based on consecutive runs didn’t show any trend as corrosion rate was not linear and even in some cases no growth detected therefore corrosion growth rate is difficult to predict. The used heat shrink sleeve material was approved as per ISO 21809-3 system 14B (cross-linked heat-shrinkable polyethylene-based material). While the same product has been applied in other pipelines, only this pipeline suffers from premature HSS failure mainly due to application qualification issues.
Subject pipeline protected by impressed current cathodic protection however, the disbandment of HSS results in a creation of corrosion cell beneath the coating, and as PE is shielding the CP current, no protection provided to the pipeline, hence, the pipeline is experiencing accelerated soil corrosion rate.
This paper is focusing on the current approach that OQGN is adapting to maintain the 10" mechanical integrity by interfacing both ILI frequency optimization, corrosion rate monitoring and field joint coating rehabilitation program.
KEYWORDS: Pipeline ILI, Heat Shrink Sleeve Failure, Pipeline Repair, Defect Assessment, Coating Rehabilitation
Available after the event