Avoid the Trap: Inline Inspection Through a Valve

Thursday - January 28 | 14:10 · 5.3 Unpiggable or Difficult-to-Inspect 1

Kenneth Maxfield1, Samantha Spellman-Bales2, Jason Weiss3, John Chapman4

1KMAX Inspection, Millcreek, USA, 2Platte River Gathering, Denver, USA, 3Argus, Edmonton, Canada, 4Elevation Midstream, Denver, USA

Pigging valves (pig valves) provide a novel alternative to conventional launcher and receiver trap systems, enabling the insertion and retrieval of cleaning and inline inspection (ILI) tools directly through line-mounted valve bodies. Their adoption offers compelling benefits: simplified operation, improved safety, reduced emissions during tool deployment, a smaller installation footprint, and lower capital costs. These advantages are particularly impactful for smaller-diameter and restricted-access pipeline systems, many of which would otherwise remain unpiggable for routine integrity management. Over the last six years, KMAX Inspection has focused on re-engineering conventional ILI technologies-including Magnetic Flux Leakage (MFL), Deformation sensing (DEF), and Inertial Measurement Unit (IMU) mapping-into modular architectures suitable for valve-based deployment. In collaboration with Argus, a global leader in pig valve manufacturing, KMAX designed and commercialized pig-valve-launchable ILI tools for 4", 6", and 8" pipelines. These systems leverage compact magnetizer assemblies and segmented-tool technologies to overcome the geometric, magnetic, and energy constraints imposed by the valve passage. When coupled with pigging valves, these modular ILI systems enable operators to clean and inspect previously inaccessible pipelines without major facility modifications or outages. A field case study will demonstrate the real-world impact of this approach. A pipeline operator responsible for a four-inch liquid-gathering pipeline required an integrity assessment but lacked space to install a conventional launcher and receiver trap. The line was located within a densely built facility, and surrounding utilities and structures prevented any expansion of the site footprint. Historically, this type of constraint forced operators to abandon the idea of ILI and resort to a hydro-test. Instead, the operator installed Argus pig valves at both ends of the system, allowing direct valve-based launch and retrieval of KMAX's 4" modular ILI toolset. The inspection was conducted at controlled velocities, with MFL and Deformation data acquired across the full pipeline length. The tool was launched, propelled, and received entirely through pig valves, eliminating the need for trap infrastructure. The successful run not only delivered actionable integrity data but also validated a repeatable deployment methodology that can be integrated into routine operations. These results demonstrate the technical feasibility, practicality, and strategic value of small-diameter, pig-valve-based ILI for compact or previously unpiggable assets, offering operators a cost-effective pathway to modern integrity management.

Read/Download PaperGradeAvailable after the event