ILI Run-to-Run Comparisons – Spreadsheet Comparisons are not Good Enough

Thursday - January 28 | 10:30 · 7.2 ILI Analysis 2

Tom Bubenik1, Matt Ellinger1, Stacy Hickey1, Adriana Nenciu1, Bill Harper1, Pam Moreno2

1DNV, Dublin, USA, 2DNV, Katy, USA

In-line inspections (ILIs) are a preferred methodology for assessing and managing the threat of metal loss (corrosion) in pipelines. The results from a metal loss ILI survey can be utilized to evaluate the current integrity state of the pipeline with respect to the threat. When subsequent metal loss ILI survey data are available, the combined results can be used to assess the possible future state of the pipeline. This can be accomplished by performing an ILI run-to-run comparison between the subsequent inspections. The final output of a fundamentally sound ILI run-to-run comparison analysis entails establishing final corrosion growth rates (CGRs) along the length of the pipeline, applying the CGRs to the ILI-reported metal loss anomalies, calculating time to criticality, optimizing field inspection programs, and establishing reassessment intervals. ILI vendors typically provide a final report, a spreadsheet listing, and signal data files (and accompanying viewing software) as a part of the ILI project deliverables. The pipeline industry often utilizes software solutions (i.e., spreadsheet-based solutions) to perform comparisons between subsequent ILI surveys. This typically includes performing pit-to-pit (i.e., box-to-box) comparisons from which CGRs are established based on the differences in reported depths divided by the time between the subsequent ILI surveys. These CGRs may be established on a per-anomaly basis or on a larger scale, such as an average or 95th percentile CGR within a segmented portion of the pipeline. However, software solutions based on spreadsheet listings are severely limited by the accuracy of the ILI detection and sizing results. Even if the ILI system meets the stated performance specification (i.e., ±10% 80% of the time), the resulting software solutions can lead to an inaccurate depiction of the true CGRs along the pipeline. For example, spreadsheet-based analyses will inevitably result in negative CGRs (self-healing pipe) and extremely high CGRs (unrealistic except in extraordinary circumstances). Frankly stated, spreadsheet-based CGRs are misleading, inaccurate, and inappropriate to use in integrity-related decision making. ILI signal review analyses (signal-to-signal comparisons) are a necessary part of sound ILI run-to-run comparison programs. If implemented correctly, an ILI run-to-run comparison program that includes ILI signal review analyses will result in more accurate corrosion growth rates that are agnostic to ILI reporting accuracies. This paper describes (1) why spreadsheet-based CGRs are so often wrong and (2) the practical differences between ILI run-to-run comparison programs that do and do not include ILI signal review analyses. The results provide the basis for establishing defensible and accurate ILI run-to-run comparison programs that can be utilized to manage the integrity of their pipeline assets.

Read/Download PaperGradeAvailable after the event