Internal review only — not linked in site navigation.
| Tuesday - January 26 | ||||
|
17:00 |
Exhibition open Reception sponsored by |
|||
| Wednesday - January 27 | ||||
|
7:00 |
Breakfast, Registration open |
|||
|
1.0 Plenary - Opening Session
|
||||
|
8:00 |
Opening remarks |
|||
|
8:05 |
93 Pipeline Operators Forum - 2026 Updates of Guidelines and Specifications |
|||
|
8:35 |
Young Pipeline Professional Annual Recognition Award Presentation |
|||
|
8:50 |
40 Technical Knowledge Management as a Critical Human Factor in Pipeline Integrity Management |
|||
|
9:20 |
103 Program to Assess Existing Pipelines for Reuse in Hydrogen Service |
|||
|
9:50 |
17 Forging a New Path Forward for Managing Selective Seam Weld Corrosion |
|||
|
10:20 |
Refreshment Break sponsored by.... | |||
|
11:20 |
Panel Session: |
|||
|
12:30 |
Lunch sponsored by … |
|||
|
1.1 Geohazards 1 |
2.1 Crack Assessment & Management 1 |
3.1 ILI Applications |
4.1 Integrity Management 1 |
|
|
Session chair: |
Session chair: |
Session chair: |
Session chair: |
|
|
14:00 |
136 Seeing Below the Slide – Validating Slipstik as a Rapidly Deployed Landslide Monitoring Technology |
77 No Hay, All Needles: Rethinking Run Comparison with Statistical Crack Depth Profiling |
43 Closed-Loop Active Velocity Control for Inline Inspection: Field Application on a 12-Inch Natural Gas Pipeline |
180 Normalization of Deviance as a Threat to Pipeline Integrity |
|
14:30 |
24 Study of the Operating Range of Vibrating Wire Strain Gauges for Pipeline Geohazard Monitoring |
70 Optimizing Pipeline Burst Pressure Calculations using 3-D Crack Meshes of EMAT Detected Crack-Like Features |
176 An Adaptable Phased Array Approach to Integrity Challenges: The Rooftopping Example |
84 How Five Years of Safety Case Assessments Reveal System-Wide Integrity Opportunities |
|
15:00 |
60 Establishing Ground Truth for ILI Strain Measurement: Lessons Learned from Laboratory and Field Validation Programs |
140 Are Detailed Crack Profiles Producing Less Accurate Assessment Results? |
29 Breaking the UT Barrier: Field-Proven High-Pressure Deployment of Liquid Self-Contained UT ILI (LS-C UT) in Gas Pipelines |
9 Thirty Years of Experience In Operators Working Together and Successfully Interacting with their Regulators – The Successes and Lessons Learned |
|
1.2 Hard Spots |
2.2 Crack Assessment & Management 2 |
3.2 Engineering Assessment 1 |
4.2 Hydrogen Transportation |
|
|
Session chair: |
Session chair: |
Session chair: |
Session chair: |
|
|
15:30 |
85 Hard Spot Inspections in Multi-Diameter Low-Pressure Gas Pipelines |
54 Advancing ILI-Based Characterization of Circumferential and Off-Axis SCC: An Operator’s Evaluation of Non-Ultrasonic Technologies for Integrity Management |
28 Advanced Engineering Assessments for Complex Threats and the Role of Inline Inspection |
150 Old Pipe, New Fuel: Defects Found by Low-Field MFL ILI Ahead of Hydrogen Conversion |
|
16:00 |
76 Integrating Pipe Manufacturer Hard Spot Classification with High and Low Field Magnetization for Improved Hardness Prediction |
47 Beyond the Niche: Closing the Gap in Circumferential Crack Detection in Gas Pipelines with EMAT ILI |
22 A General Stress in Buried Pipe during Ground Vibration due to nearby Blasting or Pile Driving |
36 Enabling Safe Hydrogen Pipeline Modification: Integrated Deployment of Grouted Tees and Double Block-and-Bleed Isolation in SGN’s LTS Futures Trial |
|
16:30 |
Conference Day 1 concludes | |||
|
16:30 |
Exhibition Reception sponsored by.... | |||





